Prime Restoration Birmingham Headquarters · 801 S Adams Rd, Birmingham, MI 48009
Birmingham: combined sewers and some of the oldest bathrooms in our service area
A lot of Birmingham bathrooms date to the 1940s through 1960s, median build year 1960, with original cast-iron drain lines and decades-old wax rings. A wax ring that age is a slow leak more often than a dramatic overflow: a small amount of water goes into the subfloor at every flush, with no puddle on the surface until the floor starts to give.
Birmingham's combined sewers raise a second risk during heavy rain: a basement toilet can back up when the pipe surcharges, as a floor drain does. We treat that water as sewage from the first minute regardless of how it looks, contain the area, and disinfect before drying starts.
Our Birmingham headquarters puts a crew in most Birmingham bathrooms in about 25 minutes. See our Birmingham water damage restoration page.
- Overflow basin
- 5.5 million gallons, Linden Park
- Median year built
- 1960, 70% built before 1980
- Response
- Typically 25 minutes, 24/7
Areas we cover from this office: Mill Pond, Shain Park, Quarton Lake, Poppleton Park, Holy Name and Pembroke Park, downtown, plus Beverly Hills and Bingham Farms. ZIP 48009.
Directions to the Birmingham officeWater damage restoration in Birmingham(586) 277-1069












